Español English | Euskera | Francés
| Final customer | Country | Project |
|---|---|---|
| Inima-Aqualia | Argelia | IDAM Mostaganem 227.000 m3/día |
| Acciona Agua | Argelia | IDAM Fouka 120.000 m3/día |
| Acciona Agua | Australia | IDAM Adelaida 300.000 m3/día |
| Degremont | Argelia | ETAP Koudiat |
| Degremont | Egypt | EDAR Alexandria |
| Degremont | Egypt | EDAR Gabal (El Cairo) |
| Aqualia | Mexico | ETAP Acueducto |
| Befesa-Sadyt | Argelia | IDAM Honaine 200.000 m3/día |
| Drace | Ireland | EDAR Shanganah (Dublin) |
| Cadagua | Portugal | EDAR Seixal |
| Drace | Spain | ETAP Ibiur |
| Degremont | Argelia | Varias ETAP: Athmania / Aintin / Sidi Ladhel |
| Ondeo | France | EDAR Montoir |
| Consorcio de Aguas Bizkaia | Spain | Control de Reactores Biológicos EDAR Galindo |
| Mancomunidad de Valdizarbe | Spain | Telemando red de abastecimiento |
| Consorcio de Aguas Gipuzkoa | Spain | Telemando red de abastecimiento |
| TEDRA | Australia | IDAM Altona (Control) |